My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119562
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:39 PM
Creation date
11/25/2007 7:16:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
GENERAL HYDROLOGY DESIGN METHODS
Section_Exhibit Name
TAB 13 ATTACHMENT 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Drainage Area. {n some instances, the mining operations will cause the drainage area to <br />change during the life of tfie sediment structure. When the pit moves into the watershed, <br />runoff is intercepted by the pit and diverted away from the structure. In these cases, a <br />conservative procedure was used; the structure was analyzed for the largest anticipated <br />drainage area that will contribute runoff to the structure. This condition usually occurs <br />at the start of mining and again during the reclamation period. Drainage areas for <br />structures are measured on a 1" = 400' and 1" = 1000' topographic map. <br />Unit Hydrograph and Surface Condition. The SEDCAD computer program provides three unit <br />hydrograph shapes to choose from in determining the runoff characteristics of a watershed. <br />Time of Concentration. The time of concentration, tc, is defined as the time required for <br />water to flow from the hydraulically most remote point in the watershed to the watershed <br />~ outlet. <br />The time of concentration for sedimentation structures was calculated using the following <br />equation (Barfield et al„ 1983). <br />• tc _ L .8(S + 1)0.7 <br />1140 y0.5 <br />where tc = time of concentration in hours <br />L = hydraulic length of watershed in feet <br />5 = maximum retention <br />= 1000 -10 <br />CN <br />Y = average land slope in percent <br />Fer diversions, culverts, sediment traps, and ditches, the following equation was used to <br />obtain the time of concentration, tc, to better represent the peak flows for these <br />structures (USBR, 1977). <br />tc = ( 11,9(L)a ]0.385 <br />H <br />• <br />where: L = hydraulic length of watershed (miles) <br />H = watershed elevation difference (feet). <br />13-1-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.