Laserfiche WebLink
CAMAS America, Inc. ~ • III IIIIIIIIIIIII III <br />Support Services Group-Denver Region <br />3609 Sou[h Wadsworch Boulevard Suite 300 Lakewood Colorado 80235 <br />Telephone (303) 980-2424 Facsimile (303) 980-6002 <br />July 29, 1994 RE~%Fl~~O <br />pug 0 21994 <br />Mr. Berhan Keffelew Geo)r,~~y CAMAS <br />Environmental Protection Specialist plvision c~' agi1eits)s ~ <br />Division of Minerals and Geology <br />1313 Sherman Street -- Room 215 <br />Denver, Co. 80203 <br />RE: Answer to Adequacy Concerns, Longmont Operation, DMG File No. M-94-027. <br />Dear Mr. Keffelew: <br />Below are our responses to your Adequacy Concerns as noted in your correspondence dated <br />July 14, 1994. <br />The concerns are addressed in the order conveyed to me: <br />1. Please review Exhibit J -Vegetation Information. In that section is a field report by <br />Dr. Eric Olgierson and a response to that report and related map by Terry McKee of the <br />USACOE. Mr. McKee states that be is in agreement with the jurisdictional wetland <br />delineation of Dr. Olgierson's. The two ponds you mentioned in your letter of July 14 are, <br />indeed, jurisdictional wetlands. Dr. Olgierson is currently corresponding with the <br />USACOE to determine whether a permit is necessary and if so, what kind, or whether <br />simply a replacement wetlands mitigation plan wilt suffice. Prior to any mining on the <br />site, being herein applied for, a copy of the approval letter from the USACOE approving <br />our permit or mitigation plan will be forwarded to the DMG. <br />2. a. Loading of asphalt is assumed to mean that location at which the asphalt is fed into a <br />truck from the overhead silo. Therefore, Cooley Gravel Company agrees to pour a <br />concrete pad below this silo. The dimensions of this pad will be 6 inches deep, 20 feet <br />long and 8 feet wide. In lieu of the concrete pad, a concrete and steel weighing scale <br />may be placed under the silo. This scale will provide similar spillage protection as that <br />provided by a concrete pad. The pad will be constructed at the same time as erection <br />of the asphalt plant per your request. <br />b. A minimum 2 ft. high berth will be placed around the perimeter of the asphalt batch <br />plant site prior to operation of the asphalt plant per your request. <br />Bituminous Roadways Cooley Gravel Company Flanagan Ready~Miv Limited <br />Lakewood Colorado Lakewood Colorado Denver Colorado <br />