Laserfiche WebLink
04/17/2000 12:43 <br />page 2, <br />719-543-1329 <br />• <br />Exhibit "D" <br />BARNHART AGENCY <br />~I <br />PAGE 03 <br />As stated in exhibit "D"the operator will sell overburden if a market exist at the time it is mined. <br />It is true that a 12" layer of overburden will be replaced on site and if you calculate that for 9.9 acres <br />the operator will have to move 15,972 cubic yards of material. We agree that 12" of overburden will <br />be moved and the revised cost along with the added re-seeding cost have been added to the <br />reclamation cost detail sheet (see enclosed Exhibit "D" Reclamation Cost). Therefore the operator <br />does agree with the Divisions Total Performance Bond Amount of $ 26,432.00. Please use the <br />revised reclamation cost sheet we have enclosed as part of our application. <br />We hope this as cleared up any confusion relating to our application however if your have any other <br />question please call or fax me at 719.543.1324, fax 719.534.1329, thanks for your considerations. <br />,Sincerely, <br />', - <br />I° oe Gagliano <br />