My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119068
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:47 PM
Creation date
11/25/2007 6:27:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992058
IBM Index Class Name
Permit File
Doc Name
MICA WHITE
Section_Exhibit Name
EXHIBIT A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FQh, "HALE ~ ~ =.I iF~ ~E1 R fC~ FHr_rt IE f lii. ~ 1'? ~~;a -{-ro FO'_ <br />_• <br />Mica White <br />Exhibit D <br />Reclamation Plan <br />M~nin4 Pit <br />The tinish~d slope on the exr.avated sides of the pit will be <br />2:1, the came as the already existing slope, The pit floor <br />slop? will be no greater than a 3:1. Due to the steegnes9 of <br />tl~c already existing slope, and of tl-~e fact that no topsoil <br />exists seeding is impractical. <br />NO RECLAMATION OF THE MINE SITE WILL TAKE PLACE!! <br />Processing and Stockoili.na Area <br />The sits will be rcclaimed according to BLM Requirements. <br />Topsoil will be removed G to 8" dcep, anA they, stn~lcpiled <br />and stabilized for reclamation. The topsoil will be seeded <br />nc:curding to SCS reeeomendations. <br />RECLAMATION OF THE PROCESSING 6 STOCKPILING AREA IS THE ONLY <br />RECLAMATION THA'I' WILL TAKE PLACE! <br />NU RECLAMATION OF THE ROAD WILL TAKE PLACE: <br />SEE Al"!'ACHED SGS SEEDING RECOMMENDATION!! <br />T'he area to be reclaimed is ap+Nsoximately 4 (four) 3CCbS. <br />7.'he estimated costs for an independec,t contractor to reclaim <br />t:he site wrP: <br />Py'4a~IJr <br />0 GtYGet ac~~~ <br />o <br />G~.o Coff affoa 4Q w,/l~i~r~-~,- <br />r <br />]:TEM UNIT UNIT COST AMOUNT OTAL <br />Mobilization Lump Sum 1750.00 1750.00 <br />F: Manpower <br />Seeding Acre 40.00 4.00 160.00 <br />Mulching Acre 150.00 4.00 600.00 <br />Fertilizing Acre i0.00 4.00 40.00 <br />Seedbed Lump Sum <br />Preparatiuri* 1000.00 1 000.00 <br />((µRf~ r`~4'!r~;~j~ /J. ~~ Total Costs 3550.00 <br />//w1 t ~W 1/tei~. <br />"~ indirect coat multiplies 1.158 <br />Total F.stiir~ated eosin 1110.90 <br />*Seedbed Preparation includes sptea~ing cf stabilized topsoil <br />at the four acre proces3ing sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.