Laserfiche WebLink
(STELE ROSE ONE. Inc.) <br />1 10t2) Limited Lnpact Operations <br />Mine (M-20063 t) <br />shall include the relevant information specified in Mineral Rule 3.7.13. <br />f) See Exhibit C Appendix B {maps). See also Exhibit E -Map. <br />g) No new roads are anticipated. F5336 and the existing access road are the only <br />roads nn the claim. Any road improvements shall he done to Forest Setl~ice <br />standards. The existing access mad is part of the proposed permitted acreage and <br />shall be reclaimed. <br />h) No water (except drinking water) shall be used in conjunction with this proposed <br />oneration. <br />i} No groundwater or surface water shall be disturbed in this operation. <br />j) N/A; nn water used or onsite. <br />k} If refuse or acid producing materials are encountered onsite (e.g. sulfides), such <br />materials shall be completely removed and sent offsite for appropriate processing <br />andlor disposal. The DMG shall be notified if refuse or acid producim~ materials <br />are encountered onsite. <br />Note on Sulfides: No sulfides have been encountered to date in either the <br />existing pit or piles. These features have existed for at least 10 years; also <br />significant quantities of calcite and other basic minerals have been found dueing <br />exploration. Water from the bottom of the pit repeatedly tests as neutral or <br />slightly basic (pH 7-7.5). Our processors require notification of the presence of <br />sulfides as sulfide ores require different processes. Repeated testing for the <br />presence of sulfides and sulfates haven't found any. Field testing far sulfate uses <br />a few drops of barium sulfate aqueous solution nn supematattt from crushed <br />samplelwater; sulfide testing invoh es heating a small amount of crushed sample <br />and testing for sulfur dioxide with a Draeger tube or test paper. Field testing is <br />done on all ore by ottr Technical Director, a qualified chemist. <br />1) The following measures shall be taken on an ongoing basis to minimize <br />disrirrbance to the hydrologic balance, prevent off-site damave, and provide far a <br />stable configuration of the reclaimed area consistent with the proposed future land <br />use: <br />Refilling all pits and trenches; <br />Recontouring the slope to a natural setting; <br />Replacing available topsoil; <br />Seeding topsoil piles with FS approved mix and monitoring all piles for <br />erosion problems. <br />m) As the ore bodies lies from one to fifteen feet below the surface, and differs <br />from topsail or overburden both in color and density, separation is accomplished <br />by removing and stockpiling overburden and topsoil fix backfill. Subsequently <br />the ore is separately removed and shipped off site. The Steel Rose 1, htc. <br />specifies that no processing of ore shall take place on site. <br />n) Gold, Silver for sale. <br />o) No explosives shall be used. <br />6.3.3(3) <br />No tailing ponds are part of the project N/A <br />2/6/2007 <br />Fage 9 of 1 1 <br />