Laserfiche WebLink
<br />Mined Land Reclamation <br />-page 2- <br />The dyke is still piled up drying. This will be flattened down on <br />top so we can get it growing with vegetation that the soil conservation <br />has recommended. We started excavating some gravel in May. Top <br />soil and overburded removed off of 3.44 acres have disturbed a total <br />of 6.9 acres. <br />I am making this report to you so you will be aware of what has <br />happened to this buffer zone and that we are trying to correct it. <br />Sincerely yours, <br />~~~+~'~" <br />Bruce Cramb <br />General Manager <br />Valco, Inc. <br />