Laserfiche WebLink
J Permit or job action : 172c application review <br />NO. ~ TASK DESCRIPTION <br />FORM FLEET TASK DIRECT <br />USED SIZE HOURS COST <br />D <br />002 -Scale highwall for loose rock excavate 1 3.6 $399 <br /> <br />003 -Place riprap spill-down at SW drainage excavate 1 1.32 $144 <br /> <br />004 -Rip & grade 3 acres dozer 1 8.8 $1,473 <br /> <br />005 -Replace topsoil 1' depth over 4 acres affected area dozer 1 175 $2,833 <br /> <br />006 -Revegetate 5 acres affected land revege 1 8.0 $2,674 <br /> <br />007 -Haul reclamation equipment to and from job site mobilize 4 5.3 $2,260 <br /> <br />008 -Construct 1000 feet of safety fence at $2.38/In.ft. NA 1 16.0 , $2,380 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suaTOrALS: 60.73 $12,163 <br />includes inFlation factor adjustment of : NA % TOTAL OtRECT COST' _ $12,163 <br />INDIRECT COSTS <br />OVERHEAD AND PROPIT • LIablllty If15UranCe : 2.02 % of direct total = $246 <br />Performance bond : 1.05 % of direct total = $128 <br />Job superintendent: 30.36 hrs`...$/hr, $39.38 total= $1,196 <br />Profit : 10.00 % ofdirect total = $1,216 <br />'assume net hours = 50Yo of task hours TOTAL O & P = $2, 785 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $14,948 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cnfr. NA total = $747 <br />CONTINGENCY- NA` NA total= NA <br />'con(ingencies accounted for at task level TOTAL INDIRECT COST= $3,533 <br />TOTAL BOND AMOUNT (direct + indirect) _ $15,696 <br />