Laserfiche WebLink
I <br />r <br />r <br />r <br />i <br />1 <br />16. operation will be (is): <br />Under 5,000 tons cu, yds/yr. <br />5,000 - 50,000 tons cu. yds/yr. <br />50,000 - 250,000 tons cu. yds/yr. <br />Over 250,000 tons cu. yds/yr. <br />17. Total anticipated <br />Production 5 X 106 <br />18. Mining Method: <br />Open Pit <br />Drill & Blast <br />Quarry: <br />Hill Top <br />Side Hil <br />Low Level X <br />Clay Pit <br />Borrow Pit <br />Other <br />X <br />Maximum anticipated <br />tons (yards) Depth 15-20 ft. <br />(Check all applicable) <br />Gravel/Sand Pit X Single Bench <br />Trailings Pond <br />Waste dump <br />Multibench <br />Dragline <br />Shovel <br />Truck to processing <br />plant (To RR) X <br />Slurry Pump <br />Rail <br />Underground <br />19. If processing of the ores or minerals mined is planned <br />to be conducted at or adjacent to the site, briefly <br />describe the nature of the processing and explain <br />disposal method of the tailings or waste from processing. <br />A portable crusher will process mined material on a <br />seasonal basis. A limited amount of fines from wash material <br />is collected in settling ponds. <br />A-9 <br />