Laserfiche WebLink
(e) There will be no waste rock dumps, underground mine openings, ditches, <br />sediment control facilities, buildings or other features remaining after reclamation. <br />(f) Reclamation Cost Estimate <br />TOTAL COST <br />Backfilling/top soil application/Grading $4,000.00 <br />Seeding 500.00 <br />Cost of Seed 1,000.00 <br />Total $5,500.00 <br />UNIT COSTS <br />Duration of Job 6 Days <br />Backfilling/top soil application/Grading $400/Acre <br />Seeding $50/Acre <br />Cost of Seed $100/Acre <br />Grader/Scraper (including depreciation) $95/Hour <br />Operator Wages & Benefits $17/Hour <br />Fuel & Lube $100/Day <br />Mobilization & Demobilization $250 Each <br />Hauling Cost $.25/Cu Yd <br />Average Haul Distance 500 Feet <br />