Laserfiche WebLink
Page 2 C- 29939- R/W <br />TERMS AND CONDITIONS OF GRANT <br />Pursuant to the authority vested in the undersigned by Order No. 701 of the Director, <br />• Bureau of Land Management, dated July 23, 1964 (29 F.R. 10526), as amended, a right- <br />of-way, the details of which are shown above, is hereby granted. The right-of-way <br />granted herein is an easement issued pursuant to the statutory authority cited above <br />does not convey an interest in the land or give the grantee any estate of any kind i <br />fee in the lands; is a non-exclusive right to construct, operate, and maintain on <br />public lands only those facilities represented and at the location(s) shown on the <br />hereinabove designated map; and is subject to the following terms and conditions: <br />1. All valid rights existing on the date of the grant. <br />n <br />2. All regulations in the group specified above. <br />3. The provisions, limitations, and conditions of Title V of the Federal Land Policy <br />and Management Act of 1976 (90 Stat. 2743, 2776-2782; 43 U.S.C. 1701, 1761-1771). <br />4. Surveying and clearly marking the exterior limits of the right-of-way prior to <br />the commencement of construction or other surface or vegetation disturbing <br />activities. Said marking shall be done utilizing staking, flagging, or some <br />other method that will result in minimal environmental damage, and shall be done <br />at frequent enough intervals to readily identify the exterior limits on the <br />ground. All activities directly or indirectly associated with construction or <br />maintenance of the right-of-way granted herein must be conducted within the limits <br />of the right-of-way. <br />5. Compliance with the attached terms, conditions and stipulations, as contained on <br />• the attached pages numbered 1 through ~ 8 which are hereby made a part of this <br />decision. <br />6. Filing proof of construction within 90 days after completion of construction or <br />after all restoration stipulations have been complied with, whichever is later, <br />but in no event to exceed five (5) years from the date of this decision. <br />7. The right of renewal upon expiration of this grant is the project is in operation <br />at that time and if the grantee has fully complied with the terms, conditions, <br />and stipulations contained herein. If renewed, the right-of-way will be subject <br />to regulations existing at the time of renewal and such other terms and conditions <br />deemed necessary to protect the public interest. <br />8. Suspension or termination for abandonment or noncompliance with the terms, <br />conditions, and stipulations contained fierein upon a finding by an authorized <br />officer of the Bureau of Land hanagement that grounds for such termination of <br />suspension exist and that such action is justified. Said termination or suspension <br />shall occur only after: (i) the holder of the right-of-way is given due notice; <br />(ii) the holder is provided a reasonable opportunity to comply with said notice; <br />and (iii) an appropriate administrative proceeding is held pursuant to Title V, <br />United States Code, Section 554.. <br /> <br />' ` CSO 2800-4(2) (3/80) <br /> <br />