Laserfiche WebLink
i <br />1 <br />+ <br />' DI STURBANCE AREAS AND TIMETABLE <br />i ' <br />i T he mining at this site will occur in two phases as shown <br /> on the mining plan. Initial disturbance will occur at the southeast <br />t corner where mining will begin, end et the southwest c orner <br /> where the processin g site is located. The table below shows <br />' th ti <br />t <br />d di <br />t <br />b <br />d <br />h <br /> e es ma <br />e <br />acrea ge <br />s <br />ur <br />e <br />eac <br />year. <br />' <br /> YEAR MAJOR MODERATE MINOR RELEASED <br />' ' 1986 11 16 -- -- <br /> processing site <br />' 1987 13 16 11 -- <br /> 1988 13 16 13 11 <br />' 1989 13 16 13 24 <br /> 1990 13 16 13 37 <br />' 1991 13 16 13 50 <br />~ 1992 13 16 13 63 <br />' 1993 13 16 13 76 <br /> 1994 13 16 13 89 <br /> <br />' 1995 13 16 13 102 <br /> 1996 13 16 13 115 <br />t 1997 <br /> 13 16 13 128 <br />~~ ' 1998 13 16 13 141 <br /> 1999 13 16 13 154 <br />~ ' 2000 13 16 13 167 <br /> 2001 -- 16 13 180 <br />' 2002 -- 16 16 193 <br />i <br /> 2003 -- -- -- 203 <br />i ' <br /> <br />' <br /> D-7 <br />