Laserfiche WebLink
10) Please supply a typical drawing of the fuel farm secondary containment structure. The drawing <br />should include the mil thickness of underlayment materials and berm construction. <br />11) It is noted that an asphalt plant will be in use on site. Please provide a plan for weekly clean up <br />of overspill material and designate an area for the temporary disposal of such materials. The <br />temporary site must be above the natural water line of the site. <br />12) Staff notes a heavy line on Map C-1 a that is not identified in the Legend. It appears to be the 100 <br />year flood plain. Please clarify. <br />This review is preliminary as noted. Responses to the Division's questions may raise more issues that <br />need additional information to resolve. Without copies of the notices to adjacent landowners and proof <br />of publication staff cannot guarantee that the process has been done correctly. By Rule, if the notices <br />are done in error, the time frame for comments starts anew. Additionally, Division staff will be <br />conducting aPre-operational inspection on Apri15`h, 2007. During that inspection other issues maybe <br />noted that need to be addressed as well. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and <br />Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, <br />telephone no. 970.241.1117. <br />Sincerely, <br />/ G~2 <br />/~ <br />G. Russell Means <br />Environmental Prot ction Specialist <br />