Laserfiche WebLink
Mine Life <br />Task Description Expected Duration (yr) <br />Pre-mining preparations (Ditches, Berms, Snipping, 0.20 <br />etc.) <br />Mine Phase l reclaim previous area. 0.66 <br />Mine Phase 2 reclaim previous area. 0.71 <br />Mine Phase 3 reclaim previous area. 0.44 <br />Mine Phase 4 reclaim previous azea. 0.44 <br />Mine Phase 5 reclaim previous area. 0.14 <br />Reclaim 5nal mining area and Staging Area. 0.20 <br />Total 2.8 <br />GarTield County and Enviromental Impacts <br />No significant change of impact is expected from this operation to the County. This permit <br />will supply the existing demand of the Chambers site. The pit is wet, therefore dust will be <br />mitigated. All tanks will have secondary containment under the SPCC Plan and discharges are <br />carefully regulated under the CDPHE discharge permit. The final landscape will consist of <br />lakes, wetlands, dry rangeland azeas, and cottonwood riparian azeas, which will have an <br />excellent appeazance from the I-70 corridor, Highway 6 and 24, and will be an asset for <br />wildlife. <br />11/7/2005 Page D-S <br />