Laserfiche WebLink
Don Kehn ~ <br />Construction Inc. <br />6322 So. College <br />Fort Collins, Colorado 80525 <br />13031226-4111 <br />Exhibit B - Mining Plan: <br /> <br />CONTRACTORS <br />1). Level to drain northeast triangular portion of site to match <br />grade of adjacent areas of pit. Stockpile this sand and gravel at base <br />of existing slopes for future gravel screening purposes. This leveled <br />area to be area for stockpiled materials. This work to be done by <br />Caterpiller 627B self propelled scrapers. <br />2). Upon completion of Item 1, install fence on east, north and west <br />sides to enclose the leased area from other parties. <br />3). Utilizing caterpillar 627B scrapers strip the top 12" of topsoil of <br />the area on top of slope. Store this material for future reclamation <br />procedures in the leveled area as explained in Item 1. We feel that <br />stripping 12" minimum will be sufficient for future replacement as <br />nearly one-half of the affected area has been excavated by others <br />without any topsoil being replaced or stored onsite. <br />4). Screening operations to begin for various contracts as needed. <br />5). Slopes to be dozed at least 2:1 as mining progresses to minimize a <br />public health hazzard. Mining to be started from North to South, <br />and east to west. <br />Seeding to be completed when area has been depleted of gravel. See <br />requirements we acknowledge per Soils Conservation Service letter <br />attached. <br />Asphah Paving • Crushed Aggregates • Eanhmoving • Trucking • Underground Utilities • HytlroCrane Services <br />