Laserfiche WebLink
-3- <br />6) a) Pursuant to 34-32-118(5) of the Ad, the Board has a right of errtry to reclaim the lands <br />affected by the operation, or to respond to an antergency where the Division determines that any of the conditions <br />ofC.RS. 34-32-124.5. exist. <br />b) The Board will emter the lands to perform reclamation only if the Board has <br />d~em»ned: <br />not beer performed, and <br />i. that reclamation required by law to have been performed upon such lazrds has <br />ii, that fnmrncial warranty forfeiture proceedurgs described in the Act or similar <br />provisions of subsequem laws, if any, have been initiated. <br />c) The Division, adnrg for the Board, will errter lands to respond to an emergetcy only <br />where the Division determhres that any ofthe conditions of Construction Material Rule 8.4.2. exist. <br />'n Tire additional conditi~s set forTlr ur the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />CH L B. G <br />Division Director <br />M-AP-32 <br />