Laserfiche WebLink
H/S Properties Pit <br />DMG 110 Application <br />Reclamation Cost Estimate: <br />Earthwork: High-wall reduction 20ft vert. to 3:1 slope x 800ft 1.33 swell = 11822 cy <br />Cat D9R estimated at 1019 cy/hr@ $180/hr = $2,088 <br />Replace overburden 2 trucks and loader at 600 cy/hr @ $160/hr <br />8" on 2.4 acres <br />2,594 cy/600 cy/hr x $160 <br />_ $692 <br />Rip 4.5 acres <br />Replace topsoil <br />6" on 4.5 acres <br />Cat 14H grader @ $108/hr x 1 ac/hr x 4.5 = $486 <br />2 trucks and loader at 600 cy/hr @ $160/hr <br />3,630 cy/600 cy/hr x $160 = $968 <br />Grade 4.5 acres Cat 14H grader @ $108/hr x 4.Sac/1.3 ac/hr = $374 <br />Seeding and mulch Assume $1000/acre, 4.5 acres <br />50% failure rate = $6,750 <br />Mobilization 2.5 miles one way, includes seeding equip. = 1 000 <br />Subtotal = $12,358 <br />Overhead and Profit Subtotal x 18.5% = 2 286 <br />Total Contract = $14,644 <br />DMG Management 5% of Total Contract = 732 <br />Total Bond Amount = $15,376 <br />