Laserfiche WebLink
EXHIBIT "D" <br />Reclamation Plan <br />Exhibit "D" (Rule 6.3.4) <br />a. As mined areas aze completed, topsoil will be replaced and area will be reseeded. <br />b. slopes will be at a minimum of 3:1. <br />c (i) Topsoil depth was minimal. It will be replaced at the depth removed, 2" t <br />(ii) As mined azeas are completed, topsoil will be replaced and it will be reseeded. <br />Seed bed will be tilled then seeded and straw or hay mulch. <br />(iii) <br />(iv) Seeds aze to be drilled <br />(v) Mulch will beused -straw or grass hay is to be crimped. <br />(vi) NA <br />d. No streams, ponds, buildings, or roads are to remain after reclamation. The haul road <br />will be returned as pastureland as the rest of the site. <br />e. NA. There will not be any waste rock dump, ditches, etc. <br />2. The reclamation estimate is enclosed. <br />M:\Nlining\exhibitD.wpd <br />