Laserfiche WebLink
EXHIBIT "C" <br />Mining Plan <br />A. October 2005 to October 2015 <br />B. Topsoil depth minimal, 2" f. Topsoil to be removed then reapplied for reclamation. <br />C. Overburden depth minimal, if any, will be used gravel <br />D. Approximately 10' to 15' <br />E. Haul road is approximately 300' long, 60' wide to excavation site from WCR 115. <br />Processing site will consist of portable crusher conveyors. There will be no buildings. <br />F. Total area is less than 10 acres. Stockpile area is approximately 200' by 400'. <br />G. New haul road will be approximately 300' long by 60' wide. Any drainage from haul road <br />will be back towards the pit to be contained. <br />H. Water is to be used for dust control from Weld County's Geisert Pit. Use will be as needed. <br />I. No groundwater is to be encountered during excavation. <br />J. NA; we will not be injuring any water rights. <br />K. NA <br />L. Excavation is will be sloped to a minimum of 3:1. The site will be reclaimed to pastureland <br />and be reseeded per NRCS and landowner recommendations. <br />M. The material will be processed on site using a portable rock crusher. There aze no processing <br />chemicals. <br />N. NA <br />O. All excavated material will be used on Weld County's roads <br />P. NA <br />M:1MininglexhibitC. wpd <br />