My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118009
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:43 PM
Creation date
11/25/2007 4:36:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200520510
IBM Index Class Name
Permit File
Doc Date
6/14/2005
Doc Name
Cost Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin~t Software <br />Task # <br />Date <br />User <br />X03 State :Colorado <br />06/14/2005 County : Routt <br />JRS Site : Foidel Creek Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2005-205-10 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />Permit/job# : C-1982-056 <br />Abbreviation :none <br />Filename : C056-X03 <br />to Drill Pads and Mud Pits <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.01 NA <br />OperatingcosUhour : $93.55 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $31.78 NA <br />Total unit cost/hour : $176.34 Total fleet cosVhour : $176.34 <br /> <br />,: ;. <br /> <br />MATERIAL QUANTITIES <br />_.... <.;: <br />Initial Swell Loose <br />volume : 16,670 BCY factor : 1.250 volume : 20,838 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br /><. ::: <br /> <br />HOURLY PRODUCTION <br />•: <br />_.: <br />Job Condition Correction Factors <br /> <br />Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (1 <br />Average site altitude : 6,800 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />EaRh - Drv packed <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production : 504.38 <br />Adjusted fleet production : 504.38 <br />(~d-~ <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 41.31 Hours <br />Unit cost : $0.350 /LCY Total job cost : $7,285 <br />
The URL can be used to link to this page
Your browser does not support the video tag.