My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118009
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:43 PM
Creation date
11/25/2007 4:36:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200520510
IBM Index Class Name
Permit File
Doc Date
6/14/2005
Doc Name
Cost Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinn Software <br />PROJECT IDENTIFICATION <br />Task # : X02 <br />Date : 06/142005 <br />User : JRS <br />State :Colorado <br />County : Routt <br />Site : Foidel Creek Mine <br />Permiujob# : C-1982-056 <br />Abbreviation :none <br />Filename : C056-X02 <br />Agency or organization name :Colorado Division O/Minerals And Geolog; <br />Permit or otherjobaction :Notice oflntentX-2005-205-10 <br />Task description : Regrade Drill Pads and Mud Pits <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />To[al unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 13,100 BCY <br />Utilization <br />$51.01 NA <br />$93.55 100 <br />$0.00 0 <br />$31.78 NA <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$176.34 Total fleetcosUhour <br />$176.34 <br />Swell Loose <br />factor : 1.250 volume : 16,375 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUC71ON Job Condition Correction Factors Source <br />Average push distance : 85 feet <br />Unadjusted hourly production : 1,405.9 LCYlhr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (i <br />Average site altitude : 6,800 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.357 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted Sleet production <br />Total job time <br />Total job cost <br />0.75 (avg,) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshifUday) <br />0.80 (ind-rfl <br />0.90 (Cat HB) <br />1.00 (Cat HB) <br />0.87 (Cat HB) <br />1.00 (S/SUN) <br />0.35 <br />493.97 LCY/hr <br />493.97 Lcvfnr <br />33.15 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.