Laserfiche WebLink
. .. <br />Colorado Division of Mi rera is end Geology <br />ESTIMATI MG FORM - BULLD02ER YORK <br />Task #: t Prep. by: BK Task File Name: M114-7 <br />Date: 07/74/95 Permit #:M-94-774 Mine: Mordyke Pit Not <br />Permit Action: new permit ~~ N <br />Task Description: rough grade <br />XOURLY EOUI PNENT COST <br />__________ __________ Basic Machine; Cet D7N Horsepower: 215 <br /> Blade Type: Uni versel --------- <br /> Attachment #7: ROPS Cab Shift Basis: 1/day <br /> Attachment #2: 3-shank ripper ---------- <br />Cost Breakdown: <br />---=---------- Utilization X (code OSG) <br />Ownership cost/hr = f37.54 N/A <br />Operating 8 overhaul cost/h r- dozer = f30.09 700 <br /> -ripper = f7.46 50 <br />Operator cost/hr = f27.5B N/A <br />Total egpt. unit cost/hr = (90.66 Total f leet cost/hr: 590.66 <br />MATERIAL OUANT IT IES <br />___________________ <br />___________________ <br />Initial <br />Swell <br />Loose <br />Volune: 23,000.0 BCY Factor:. 1.250 Volume: 28,750.0 LCY <br />Source of quantity take-off: rec <br />Source of est. swell factor: cat hard <br />XOURLY PRODUCTION <br />_________________ Job Condition Correc tion Factors <br />Avg. push distance: 150 ft. -------------------- ------------ <br />- -------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Met. consistency.. 7.20 (Cat tbl) <br />dozer production: 524 LCY/hr Dozing method..... 7.20 (slot) <br />- -------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (7sh/day) <br />Loose stockpile Transmission type. 1.00 ( PS ) <br />--------------------- -----------_- Grade adjustment.. 1.17 (Cat tbl) <br />Avg. push gradient: 5.00 X (nag) Altitude adj. .... 7.00 (Cat tbl) <br />- -------- Materiel weight... 7.00 (Cat tbl) <br />Avg, site altitude: 7888 ft. Blade type........ 7.00 (S or U) <br />Materiel weight 2300.00 lb/LCY Net Job Correction 7.00 <br />Mat. Descr.: - -------- ----------- <br />GENERAL FILL Adjusted Unit Prod.: 524.11 LCYfhr <br /> Adjusted Fleet Production: 524.71 LCY/hr <br />JOB COST --------- <br />Fleet size 1 Dozers) Total Job Time: 54.85 Nours <br />Unit Cost (0.773 /LCY Total Job Cost: (4,973.39 <br />