Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLD02ER IARK <br />Task #: 2 Prep. by: BK Task File Name: M774-2 <br />Date: 07/14/95 Permit p:M-94-774 Mire: Nor ike <br />Permit Action: rev permit <br />Task Description: top soil spreading <br />XOURLY EWIPMENT COST <br />____________ ____--__= Basic Machire: Cet D7X Horsepower: 215 <br /> Blade Type: universal ---------- <br /> Attachnent F1: ROPS tab Shift Basis: 7/day <br /> Attachment B2: 3-shank ripper ---------- <br />Cost Breakdown: <br />-------------- utilization X (code b4li) <br />Ownership cost/hr = f37.54 N/A <br />Operating 8 overhaul cost/h r- dozer = (30.09 700 <br /> -ripper = f1.46 50 <br />Operator cost/hr = f21.58 N/A <br />Total egpt. unit cost/hr = f90.66 Total f leet cost/hr: f90.66 <br />MATERIAL gUANTIT IES <br />___________________ <br />___________________ <br />Initial <br />Swell <br />Loose <br />Volure: 70,432.0 BCY Factor: 1.429 Volume: 74,902.8 LLY <br />------------ <br />Source of quantity take-off: rat plan ---------- ------------- <br />Source of est. swell factor: rec plan <br />HOURLY PRODUCTION <br />_________________ Job Condition Correc tion Factors <br />Avg. push distance: 200 ft. -------------------- ----------- <br />- -_____~ Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.10 (Cat tbl) <br />dozer production: 3B5 LCY/hr Dozing method..... 1.20 (slot) <br />- -------- Visibility........ 7.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />Pertly Consolidated s tockpile Transmission type. 1.00 ( PS ) <br />--------------------- --------------- Grsde adlustment.. 1.11 (Cat tbl) <br />Avg. push gradient: 5.00 X (nag) Altitude adj. .... 1.00 (Cat tbl) <br />- -------- Materiel weight... 7.44 (Cat tbl) <br />Avg. site altitude: 7888 ft: Blade type........ 7.00 (S or U) <br />Material weight 7600.00 lb/LCT Net Job Correction 1.32 <br />Mat. Descr.: - ------- ______~___ <br />Top Soil <br />--------------------- <br />--------------- Adjusted Unit Prod.: 507.48 <br />---------- LCYIhr <br /> Adjusted Fleet Production: 507.48 LCY/hr <br />JOB COST --------- <br />Fleet size 1 Dozers) Total Job Time: 29.37 Hours <br />Unit Cost 50.179 /LCY Total Job Lost: 52,662.50 <br />