Laserfiche WebLink
3) Marsh funnel viscosity of at least 55 seconds. <br /> <br />' These specs are verified by a commercial mud company through the <br />attached copies of mud reports for the holes plugged in this <br />manner (Appendix I). All holes were plugged at the surface with <br />a minimum of five (5) feet of cement. The numbers and depths of <br />the drill holes abandoned in this manner are: <br />Hole # Drilled Depths Hole # Drilled Depths <br /> <br />040-85-29C 575' 040-85-23C 375' <br />040-85-26 440' 040-85-12 770' <br />040-85-26C 580' 040-85-8C 510' <br />Type 3: Flowing Holes <br />Two drill holes penetrated into an artesian aquifer. Upon <br />notification of the BLM's Little Snake Resource Area office, <br />these holes were cemented completely from top to bottom and the <br />flow was stopped. The holes which were abandoned in this manner <br />were: <br />040-BS-20C 335' Total depth <br />040-85-24C 466' Total depth <br />