My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117736
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:28 PM
Creation date
11/25/2007 4:14:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Permit File
Doc Date
11/5/2001
Doc Name
Permit Application
From
Northern Colorado Constructors
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2. Estimate project water requirements including flow rates and annual volumes for the <br />' development, mining and reclamation phases of the project. <br />We are in the process of completing a Temporary Substitute Supply Plan and Well Permit <br />' application for the site. We will forward complete calculations of water requirements after <br />we have submitted the Temporary Substitute Supply Plan to the State Engineer for review. <br />' Depletions During Mining <br />Water depletions during mining will include: 1) evaporation losses from the dewatering <br />' trench; 2) water lost through operations including washing and dust control and 3) water <br />lost with the material hauled off-site. <br />1) Evaporation Losses <br />Note that NCCI is mining the site in phases (see attached Mining Plan Map} to <br />minimize the amount of land and water disturbed at any one time. Before any mining <br />begins, the operator will install a dewatering trench around the azea to be mined to <br />' control groundwater. Approximately 90 days before a phase has been completely <br />mined, the operator will begin installing a dewatering trench in the subsequent phase. <br />The amount of exposed groundwater will vary, depending on what phase is being <br />mined. Evaporative loss calculations will be included with the Temporary Substitute <br />Supply Plan. <br />2) Water Lost Through Operations <br />Wash Pond Evaporation <br />' The wash pond will be about 4 acres in size. <br />Dust Control <br />' NCCI will apply water to haul roads and stockpiles as necessary to prevent fugitive <br />dust. It is estimated that one Load from a 3,000-gallon capacity water truck twice a day <br />(Monday through Friday) for nine months is required for dust control. <br />' 3) Water Lost with the Material Hauled Off-Site <br />NCCI estimates they will mine 400,000 tons of material annually. It is anticipated that <br />mining will begin in the winter of 2001 and it will take 8 to 10 yeazs to remove the <br />material and reclaim the site. Annual production will depend on the demand for <br />construction material and may impact the total life of the mining operation on the site. <br />' NCCI Mining Proposal for the NCCI Pit # 1- MLRB 112Pennit <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.