Laserfiche WebLink
<br />15. You sent me proofs of mailing materials to the clerk and recorder for filing additional materials, and of mailing <br />letters to the BLM. This application is still in the review stage, and all new material is still required to be <br />additionally filed with the clerk and recorder. As before, please promptly place for public review all new additional <br />materials, and forward to me a copy of the receipt for such filing. <br />The decision date is January 17, 2002. Please try to respond to this letter with enough time to allow my review <br />before the decision date. As always, faxing your letter to me is acceptable. <br />Since most of the questions and other items listed herein do not significantly affect the calculation of reclamation <br />costs, I will begin putting together some Sgures even before receiving your responses. The reclamation cost <br />estimate will be mailed to you under separate cover. L`you wish to discuss the types of bond instruments accepted <br />by the State, or request a specific bond form, please contact Ms. Suzi Ericksen at our Denver office (see letterhead). <br />I will fax this to you in the interest of time, and follow it by hard copy in the mail. L` you have questions or <br />comments, I may be reached at the Division's Durango field office: 701 Camino del Rio, Room I25, Durango, CO <br />81301; tel 970/247-5193 or fax 970/247-5104. <br />Sincerely, <br />~i' <br />Bob Oswald <br />Environmental Protection Specialist <br />cc: Barry Tollefson, BLM, 2l6 N. Colorado Ave., Gunnison, CO 81230 <br />a lophir ad03/rco <br />