Laserfiche WebLink
Table 1 <br />SEDIMENT POND - DESIGN SUMMARY <br /> POND 4 POND 5 <br />WATERSHED AREA (aeZeS): <br />Reclaimed 95.1 31.0 <br />Undisturbed 0 12.3 <br />Total Area 45.1 96.3 <br />POND PARAMETERS: <br />Bottom Elevation Ift msl) 6234.0 6076.0 <br />Principal Spillway Invert Elevation (ft msl) 6240.5 6082.5 <br />Emergency Spillway Invert Elevation Ift msl) 6291.5 6083.6 <br />Top of Embankment (ft msl) 6294.0 6085.8 <br />Storage Volume Below Principal Spillway (ac -f t) 3.96 3.05 <br />Storage Volume Helow Emergency Spillway (ac-ft) 4.85 3.89 <br />Principal Spillway Parameters: <br />Type Drop Inlet Drop Inlet <br />Riser Diameter (in) 30 30 <br />Riser Height (ft) 3.5 5.5 <br />Harrel Diameter (in) 30 24.0 <br />Emergency Spillway Parameters: <br />Type 2-30' CMPS Trapezoidal <br />Bottom Width (f t) NA 8 <br />Length Ift) 40 87 <br />Side Slopes H:1V NA 3.0 <br />HYDROLOGIC/HYDRAULIC PARAMETERS: <br />10-year, 24-hour Storm Event: <br />Precipitation (in) 2.8 2.8 <br />Runoff Volume (ac-f tl 3.96 4.4 <br />Principal Spillway Peak Discharge (cf s) 17.0 23.7 <br />Emergency Spillway Peak Discharge lcf s) 0.0 0 <br />Peak Surface Water Stage Elevation (ft msl) 6241.3 6083.5 <br />25-year, 24-hour Storm Event: <br />Precipitation (in) 3.4 3.4 <br />Runoff Volume (ac-f t) 5.0 6.14 <br />Principal Spillway Peak Discharge (cf s) 24.9 24.7 <br />Emergency Spillway Peak Discharge (cf s) 1.8 5.1 <br />Peak Surface Water Stage Elevation (ft msl) 6241.6 6084.0 <br />Pond Freeboard (ft) 2.9 1.8 <br />SEDIMENT LOADING PARAMETERS: <br />Storm Predl cted Peak Settleable Concentration (ml/1) 0.00 0.00 <br />Predicted Annual Sediment Loading (ac -f t) 0.22 0.20 <br />Available Sediment Storage Volume (ac-f t) 2.2 2.0 <br />Maximum Sediment Storage Elevation (ft msl) 6238.2 6080.8 <br />Predicted Number of Storage Years 10 10 <br />CHANNELS <br />The existing designs found in this exhibit for the channels that will <br />remain were calculated for worst case condition and should be adequate <br />for post closure conditions. No additional or redesign is required. <br />SAES <br />The existing sediment control structures associated with the SAES will <br />remain in place after final grading and topsoil placement is completed. <br />The sediment controls will remain in place until vegetation is <br />reestablished. The existing designs found in Appendix C of this Exhibit <br />209 <br />