eh <br />ESPEY. HUSTON & ASSOCIATES, INC. <br />r J <br />L <br />A culvert, sized for the 25-yeaz, Z4-hour dischazge from the sediment <br />pond, will be placed under the roadway at Sta. 6 + 13, a detail of which may be seen <br />on Fig. 13.3.5. Rip rap is recommended at the pipe outlet to minimize erosion. At <br />approximately Sta. 11 + 10 a span of the roadway will be constructed to allow access <br />to the power substation. A culvert, sized to pass the flow in the wastershed <br />diversion ditch, will be placed under this road (see location on Figs. 13.1.4 and 13.3.6 <br />and detail on Fig. 13.3.5). Access ramps to the disposal azea and topsoil stockpile <br />will be constructed as shown in plan view on Fig. 13.1.4. Culverts sized to pass the <br />flow in the sediment pond collector ditches will be placed under these ramps (see <br />detail, Fig. 13.3.5). <br />A twelve-inch layer of crushed stone or gravel is recommended as the <br />riding surface of the roadway (30 CFR 817.164). <br />13.3.6 The Topsoil Stockpile <br />• <br />The topsoil storage azea is shown on Fig. 13.1.4 in plan view and on <br />Fig. 13.1.5 in cross section. To the extent possible, topsoil will be removed and <br />replaced on finished azeas without being stored. This is not feasible for items of <br />initial construction. Topsoil which must be stored will be placed in the topsoil <br />stockpile at maximum slope of SH/IV and protected from erosion as discussed in <br />Sec. 13.5 (30 CFR 817.23). <br />13.4 PROCESS OF CONSTRUCTION <br />13.4.1 Prepazatory Construction <br />13.4.1.1 Topsoil Removal <br />As the preliminary step in each construction activity, A horizon soils will <br />be removed and stored in the topsoil stockpile or redistributed on completed areas, <br /> <br />13-12 <br />