Laserfiche WebLink
• Mitigation: Bear Coal Company submitted a precise legal <br />description of the Bear No. 3 Mine and included it in the <br />Permit in Exhibit 18, Bear No. 3 Mine, Permit Boundary <br />Legal Description. <br />A description of the areas of responsibility for Bear No. <br />1 and Bear No. 2 reclamation have been included in <br />Exhibit 25, Bear No. 1 and No. 2 Reclamation Plan. <br />B. Other Licenses and Permits - Rule 2.03.10 <br />1. Has final approval been granted for the Air Emission <br />Permit? <br />Mitigation: <br />approval for <br />Modification <br />• included in <br />inspection f <br />1985. <br />Bear Coal Company has received initial <br />the Air Emissions Permit Numbers C-12,197 <br />and 83GU335P. These permits have been <br />Exhibit 4 in the Bear Coal permit. An <br />or final approval is slated for October, <br />C. Operations Plan - Rule 2.05.3 <br />1. Topsoil salvaging and replacement at Bear No. 3 needs to <br />be clarified. Specifically, approximately how many acres <br />were stripped of topsoil, how many acres of surface <br />disturbance currently exist? Accurate estimates of how <br />much topsoil is stockpiled or stored in embankments <br />should be submitted for both Bear No. 3 and Nos. 1 and 2. <br />What depth of topsoil is to be re-spread on the surface <br />at Bear No. 3? <br />Mitigation: Bear Coal Company submitted an updated Mine <br />• Facilities Map for Bear No. 3 which includes the <br />following information: <br />-2- <br />