' • <br />1 <br />t 2) The gravel is excavated with a dragline or frontend loader <br />and trucked to a temporary stockpile near the crushing and <br />' screening plant. The gravel is allowed to drain and then <br />' is fed into the crusher by a frontend loader. <br />' 3) The water table is near the surface, and for deeper excavation <br />the excess water is pumped out of the mine area. The water <br />' is discharged into Tomichi Creek or into adjace~' mined areas. <br />i T2 bl'~?~' <br />' rr I loo-P~A z ~ I`I~I-'f'i j <br />Gravel extracRRti~~on will continue in Phase I for e~years^ Phase 2 for <br />o~rTi~u}B P~ 2U c~pu~ 143•?O>a ~o25-7p31, <br />' nine years and Phase 3 for six years, The reclamation plan for each <br />phase will be fully implemented at the end of each period. <br />After gravel mining operations are completed, all equipment will be <br />' removed, final reclamation work performed and measures taken to encourage <br />' fish and wildlife growth. <br />' SUMMARY <br />Gunnison Ready Mix Concrete Co. is a sand and gravel extraction operation <br />' on 71.97 acres in Gunnison County, Colorado. Mining will be accomplished <br />over a twenty-four(24) year period in three Phases with concurrent reclamation. <br /> A <br /> M <br />TERIAL QUANTITIES <br /> Phase I 1,157,000 tons <br /> Phase 2 1,203,000 tons <br />1 <br /> Phase 3 140, 000 tons <br />' 2,500,000 tons <br />Pace: 25 of 66 <br />