Laserfiche WebLink
' • <br />1 <br />t <br /> <br /> <br />1 <br /> <br /> <br />t <br /> <br /> <br />1 <br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />in that area. Crushing, screening and stockpiling will be done on the <br />Grave4 is now being excavated from Tract A, and the mining wily continue <br />five acre tract located adjacent to the northeast corner of the mine area. <br />The material excavated will all be used in the preparation of gravel and <br />sand for concrete production, for production of road base and for rock <br />used in asphalt paving. Since one hundred percent of the excavated <br />material can be used, there will be no backfill in the excavated area. <br />The water table is near the surface and as the gravel removal proceeds, <br />the resulting excavation will be filled with water. After all mining is <br />5 {-st T~ 6~~Q 7- Tit ca Flud'~ 4 <br />complete, o lakes will remain -one south of and north of Tomichi <br />2 wt R or f•;w .^ ~ ~ a, w. Tna .~' 3 mr P ~v.~~ : r i, u.lv &u.~«<.. >x. Ge a~QACC~ b' I,P~okJ ~ r g=.; <br />Creek. The lakes will be about 24 Eeet deep. The planned depth of ~'tQO~~ <br />t-v ~ ~q~fk ~SkI ~i <br />excavation below existing ground surface is 3A-feet. o direct connection <br />to the creek will be made. Tomichi Creek will not be disturbed by the <br />adjacent operations and an adequate berm will remain between the creek <br />and the pit. <br />The mining sequence is as follows: <br />I) Remove and stockpile topsoil. The topsoil will be used in the <br />reclamation program. Excess material will eventually be disposed <br />of outside of the mine area. <br />P.,..e 7d .,F F.l. <br />