Laserfiche WebLink
equipment and use of the most accurate and widely accepted cost and <br />productivity references for estimating requirements and costs for the <br />various c~ones~ts of the approved reclamation plan. 'IYie only areas in <br />whidi EFCI does not use published references as the basis far calcvlatior-u <br />are those for which there is no published data. In these cases, EFCI used <br />the relevant informatim fran the previous cost estimate. <br />EFCI has utilized the Dataquest, Inc. - O ust Reference Guide (QaG) and <br />c~u rent rental rates from Wagner Dquipment ~. for estimating unit ousts <br />for heavy equipment as the best references currently available for this <br />• <br /> <br />o~vw~xav~ax 1Ra ReVlsed -May 1992 <br />avmm .p. <br />