Laserfiche WebLink
<br />EXHIBIT E <br />RECLAMATION PLAN <br />32 ROAD GRAVEL PIT <br />The mining of the site will lower the entire area from 20 to 25 <br />feet below the present ground elevation. <br />The side of the pit will be sloped 3 horizontal to 1 vertical along <br />adjacent property lines from the existing gravel surface to the <br />bottom of the pit. <br />Topsoil will be spread on the slopes and the pit floor to a depth <br />of 8 to 10 inches. The area will then be seeded with the non- <br />irrigated species recommended by the Soil Conservation Service. <br />See Exhibit I. <br />• The area will be reclaimed in phases following the mining. These <br />phases will be 5 to 10 acres in size. It is anticipated that it <br />will take two years~to complete each phase of the reclamation. This <br />will allow for seeding the site twice. <br /> <br />