Laserfiche WebLink
Hinor Disturbance <br />7. Seed, fertilize, mulch <br />slope and setback <br />B. Reseeding <br />SUBTOTAL <br />GRAND TOTAL <br />I I I <br />I I I <br />I I I <br />2.5 I AC I $500.00 I$ 1,250.00 <br />I I I <br />2.5 I AC I $500.00 I$ 1,250.00 <br />$ 2,500.00 <br />$43,387.00 <br />Total disturbance at any time ~ 29.5 acres <br />Reclamation cost per acre ~ 51,470.00 <br />L-2 <br />