My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117071
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:49 PM
Creation date
11/25/2007 3:11:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Permit File
Doc Date
7/10/1990
Doc Name
Application for A Regurlar 112 Mined Land Reclamation Permit
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXF3=BTT L <br />RECLAMATION COSTS <br />These reclamation costs are based on the maximum amount of <br />disturbance which would occur during the mining operation. We <br />have identified this point when the mining is about half way <br />through Phase I, when the portable asphalt batch plant is located <br />on the site, the portable crusher/screening plant is on the site, <br />stockpiles of off-site material (mainly concrete and asphalt for <br />recycling) are located on-site and there are approximately 2-3 <br />years worth of stockpiled overburden and topsoil. <br />This exhibit corresponds with the Table of Disturbance in Exhibit <br />D. The main access road will remain after mining to provide <br />access to the Barrett Energy gas well on the property. This road <br />has not been included in the disturbance calculations. <br />Maior Disturbance <br />Item <br />No. Item <br />Cost/ <br />Amount Units Unit Cost <br />1. Replace overburden on <br />3 acre stripped area <br />2. Scarify overburden and <br />topsoil stockpile areas, <br />4.0 acres <br />3. Spread topsoil at 6-12" <br />on 3 acre stripped area <br />and 2.5 acre setback and <br />slope area <br />4. Seed, fertilize, mulch <br />SUBTOTAL <br />I I I <br />9,680 I CY 1 $ .80 1$ 7,744.00 <br /> <br />19,360 I I I <br />SY 1 <br />I I <br />i I <br />$ .15 f <br />IS <br />I <br />I <br />2,904.00 <br /> <br />I <br />8,873 I I <br />I <br />1 CY 1 <br /> <br />$ ,80 1 <br />i <br />J$ <br /> <br />7,099.00 <br />I <br />9.5 I i <br />AC 1 <br />$500.00 I <br />IS <br />4,750.00 <br />$22,497.00 <br />Hoderate Disturbance I I I I <br />I I I I <br />5. Scarify two plant sites, I I I I <br />scale house 1 72,600 1 SY 1 $ .15 1$10,890.00 <br />I ! I 1 <br />6. Seed, fertilize, mulch 1 15.0 1 AC 1 $500.00 1$ 7,500.00 <br />SUBTOTAL $18,390.00 <br />L-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.