Laserfiche WebLink
<br />u <br /> <br />These fines at the surface result from traffic movement at the top of the dump <br />and the natural segregation that occurs when the dump is constructed. <br />Each year following completion of a reclamation effort, the area <br />reclaimed will be evaluated to determine success. If reclamation does not <br />succeed, as oeterniined by three years' evaluation, the subject area will be <br />reclaimed or anew reclamation plan evaluated. <br />keclamation costs/acre are approximatel <br />1. Move 18" of "soil like material" and re-contour $1,200 <br />2. Fertilizer 50 <br />3. Seed 200 <br />4. Transplants 450 <br />5. Compact and walk-in or hantl rake 50 <br />6. Mulcts 1,000 <br />7. Labor and supervision 50 <br />TOTAL 3,000lacre <br />All areas other than those hydraulically seeded will be scarified prior to <br />seeding. <br />Wildlife <br />Wildlife has been monitored since the start of operations and will con- <br />tinue to be studied through 1982. Wildlife and reclamation will be evaluatetl <br />for inter-related effects and possible mitigative measures. Plants in the <br />seeding mixture are suitable for wildlife food and cover. <br />