Laserfiche WebLink
2.05.4 Reclamation Plan Icontinuedl <br />In order to facilitate the post-mining use of the land as rangeland, the landowner has <br />requested that the sediment pond remain after reclamation as a stock pond. The <br />demonstration of its suitability is given in Section 4.05.9 of the permit. <br />The landowner also requests that the access road be left to provide access to both the <br />grazing area and the stock pond. <br />Both areas are accurately shown on Exhibit KK-1 and Map #9 -Bonding Map. <br />A letter from the landowner requesting that these items remain is included on the <br />following page. <br /> <br /> <br />-3- <br />Revised for permit renewal 11/17/95 <br />