Laserfiche WebLink
EHI-IIBIT E <br />RECLANIATIOi1 PLAN AND TIMETABLE <br />8ecl~m~tisrn. Albert E. Frei will be the owner of the <br />property; therefore, there is no necessity for a consultation vrith <br />the owner in regard to future uses of the property. Use of the <br />land will be divided. The bench areas will be returned to "ndt <br />being used for any purpose" by revegetating. The front, <br />undisturbed side of the berm areas will remain as they are novr. <br />The access road and the hidden mine floor areas will continue to <br />be used as areas for industrial-type operations that need view <br />screening. In conjunction with the mine, it is expected that an <br />asphalt plant, concrete plant and possibly a casting plant <br />operations will be conducted on the mine floor. This industrial <br />use of the floor area is part of the Planned Development rezoning <br />submitted to Clear Creek County. <br />sv <br />The areas included for various uses will be as follows: ~11~1 .~. <br />48.66+/- acres in bench area slopes, 43.49+/- acres in road and <br />mine floor, 28.12+/- acres in undisturbed screen area and 9.75+/- <br />acres in a west buffer. It is necessary to point out that these <br />figures are based on an average mine bench slope. If the slope <br />is changed, which is a function of the rock mechanics, the areas <br />of bench and floor will be altered. <br />The bench areas will be respread with a topsoil mixture and <br />revegetated. The floor and road areas will be filled, leveled and <br />15 <br />