Laserfiche WebLink
LIST OF TABLES (continued) <br />• Table No. Page <br />Section 2.05.3 (Continued) <br />2.05.3-5 Culvert Design - 100-Year, 24-Hour Storm. 182 <br />2.05.3-6 Ditch Design. 184 <br />2.05.3-7 Ditch Calculation 186 <br />2.05.3-8 Sediment Trap Design. 188 <br />2.05.3-9 Yampa River Sediment Pond - Material Suitability Analysis 195 <br />2.05.3-10 Overburden Geochemical Analysis - Pre-Grading 197 <br />1 Sediment Yield Analysis (App. 2.05.3-7) 257 <br />2 Surface Impoundment Sediment Storage Analysis (App. 2.05.3-7) 258 <br />Section 2.05.4 <br />2.05.4-1 Swale Seed Mixture. 323 <br />2.05.4-2 Bench Seed Mixture. 325 <br />2.05.4-3 Upland Seed Mixture 327 <br />2.05.4-4 Steep Upland Seed Mixture 329 <br />2.05.4-5 Mixture Seeding Requirements. 331 <br />• <br />• <br />- ix - (Rev. 5/86) <br />