Laserfiche WebLink
• <br />LIST OF TABLES <br />Table No. Page <br />Section 2.04.3 <br />2.04.3-1 Soi 1 Mapping Units. 52 <br />2.04.3-2 Capabi 1 i ty Groups of Soi 1 s. 54 <br />Section 2.04.5 <br />2.04.5-1 Permitted Wells and Adjudicated Water Rights. 62 <br />Section 2.04.6 <br />2.04.6-1 Drill Log of Lithologies Sampled - Hole 1C. 69 <br />2.04.6-2 Drill Log of Lithologies Sampled - Hole 22C 70 <br />2.04.6-3 Overburden Analyses - Holes 1C and 22C. 72 <br />2.04.6-4 Coal Analyses 74 <br />Section 2.04.7 <br />• 2.04.7-1 <br />2.04.7-2 Drill Hole Depths and <br />Results From Standard Penetrated Strata <br />Percolation Tests 87 <br />89 <br />2.04.7-3 Water Analysis Report - Crusher Well 8 Trailer Office Well. 92 <br />2.04.7-4 Water Analysis Report - Pond by Crusher 94 <br />2.04.7-5 Water Analysis Report - Yampa River Surface Water 96 <br />2.04.7-6 Water Analysis Report - Yampa River Surface Water 97 <br />2.04.7-7 Water Analysis Report - Coal Yiew Gulch 98 <br />2.04.7-8 Water Analysis Report -Lower Yampa. River Sedimentation Pond. 99 <br />2.04.7-9 Water Analysis Report - Pond by Crusher 100 <br />2.04.7-10 Water Analysis Report - Pond fil 101 <br />Section 2.04.9 <br />2.04.9-1 Soil Mapping Units Occurring in Meadows Study Area. 111 <br />2.04.9-2 Soi 1 Analysi s Results 111 <br />2.04.9-3 Reclaimed Topsoil Quality 118 <br />2.04.9-4 Topsoil Quality of Natural Soils Within Mineable Reserve Area 120 <br />Section 2.05.3 <br />2.05.3-1 Calculation of Runoff to Culverts and Runout Ditches. 168 <br />2.05.3-2 Runoff Calculations for Areas to Determine Flow 169 <br />2.05.3-3 Computations and Data to Determine Capacity of Ditches. 170 <br />2.05.3-4 Water Bar Design - 100-Year, 24-Hour Design 180 <br />• <br />- viii - (Rev. 5/86) <br />