My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-05-13_PERMIT FILE - M1983052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1983052
>
1983-05-13_PERMIT FILE - M1983052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 11:50:58 AM
Creation date
11/25/2007 2:35:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983052
IBM Index Class Name
Permit File
Doc Date
5/13/1983
Doc Name
YOUR LETTER DATED 5/3/83 REGARDING JOKER MINE & PILOT PLANT PERMIT APPLICATION YOUR FN 83-52
From
MARATHON GOLD CORP
To
MLRD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . Because the coarse & medium grain material will be <br /> used to upgrade existing Roads in the area of the <br /> permit application and/r for a salable product <br /> only small stockpiles are forseen . Any excess will <br /> be used as backfill in the reclamation process (see <br /> page 5 of Exhibit D Mining Plan . ) These small stock- <br /> piles are located at the plant facility see attached <br /> Exhibit D-1 . <br /> 6 . The Fine grained reject material will be placed in <br /> the fine grained reject material temporary storage <br /> area ( C in exhibit F-1 ) . Since the reclamation will <br /> be done on a continuous basis , the time during which <br /> the fine grained reject material will be stored will <br /> be of short duration not to exceed the time it takes <br /> to mine out one block . The Fine grained reject <br /> material temporary storage area is in Housel Gulch . <br /> 7 . Please see Exhibit D-1 (attached ) as marked . <br /> B . a . We will set a maximum steepness on our topsoil <br /> pile slopes of 3h :ly. <br /> b. In items 3 this letter we state our intent for <br /> continuous reclamation once begun . In the event <br /> that initial reclamation begins more than 1 year <br /> after initial stockpiling of topsoil we will <br /> follow your recommendations for seeding . How- <br /> ever we do not forsee a year before commencement <br /> of reclamation operations . At the commencement <br /> of topsoil placing, the longest standing top- <br /> soil will be spread first continuing forward in <br /> time from oldest to newest . <br /> 9 . Maximum runoff can be handled with two 24 inch <br /> corrugated steel pipes . The area around the inlet <br /> will be ripraped as will the outlet spill area to <br /> prevent unnecessary erosion . <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.