Laserfiche WebLink
CIRCES Cost Estimatittg Software <br />Task # : 001 <br />Date : 07/30/Z004 <br />User : HNP <br />State :Colorado PenniVjob# :M-2004-042 <br />County : Conejos Abbreviation :none <br />Site : Whinnery - Porco Pit Filename :M042-001 <br />Agency or organization name :DMG <br />Permit or other job action :Reclamation <br />Task description :Re-grade <br />HOURLY EQUIPMENT COST <br />Cost Breakdown ; <br />overburden and <br />Basic machine : Cet D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br /> Utilization <br />Ownership cosUhour : $27.76 NA <br />Operating cost/hour : $88.44 100 <br />Ripper op,cosUhour : $0.00 NA <br />Operator costlhour : $31.98 NA <br />Total unit cosUhour : $126.19 Total fleet cosUhour <br />Operator skill : 1.00 <br />Matedal consistency : 1.20 <br />Dozing method : 1.10 <br />Visibility : 1.00 <br />Job efficiency : 0.81 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 LCY factor : NA volume : 10,000 LCY <br />Source of estimated volume :Reclamation plan <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Ave2ge push distance : f50 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.05 % (i <br />Average site attitude : 7,000 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock- 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.334 /LCY <br />a12s.1s <br />Source <br />Adjusted unit production : 378.06 LCY/hr <br />Adjusted fleet production : 378.OS LCYRv <br />Total job time : 2s.45 Hours <br />total job cost : $3,338 <br />Horsepower : 310 <br />Shin basis : 2 per day <br />Data source : (CRG) <br />