Laserfiche WebLink
<br />)lining Plan (Supplemental) <br />2/17/86 <br />Mining operetiona will be conducted in such a Wenner eo that <br />no sore than 10 acres of exposed groundwater surfnce will be <br />exposed et any tine. This night require working shallower <br />depths than anticipated or partially filling excavations with <br />materiels not required by our operetiona Ci.e. excess sand). <br />If et a later date it is found thnt Wore water eree must be <br />exposed then the necessary water rights will be obtained and <br />our permit will be modified to allow this change. <br />Materiels wined at the pit site will be crushed end processed <br />at the pit site. They will than be hauled to the plant site <br />and stockpiled for later use in producing reedy-nixed <br />concrete. <br />Materiels from other pernited pits and commerical sources <br />night also be hauled to the plant site for production of <br />concrete. Since the demand for our product is impossible to <br />predict et this tine the amounts of materiels £~oni other <br />sources le impossible to predict at this tine. <br />Equipment et the plant will include rubber-tired loaders and e <br />complete 10 cubic yard Rex Concrete Batch plant. <br />Approximately 10 concrete mixer trucks and assorted support <br />equipment will also work out of the plant sits eree. An <br />office either temporary or not will be established. <br />