<br />Mining Plan <br />It is anticipated that mining <br />e dewatering protean to lower <br />that approximately 20 feet of <br />Excavation will be eccompliah <br />loaders, hydrelic excevetora, <br />type equipment. <br />will be accomplished using <br />the ground water level such ,~~ <br />materinl ten be removed. 4 <br />ed using rubber-tired i~ <br />draglines and or dredge <br />The mining shall proceed Eton the East end of the pit in <br />e westerly direction. Crushers end other processing <br />equipment will be moved ao ea to provide the least <br />possible haul of mnteriela to end from the equipment. <br />Stockpile sltea will also move ea the Wining progresses <br />so ea tc minimize the handling costa. <br />Water removed iron the excevntion shall be pumped into <br />the remains of the old river channel which will form e <br />natural detention and settling pond. The water will <br />follow the remainder of the old channel to the Arkenaes ~ <br />River. A dewatering well permit end n dlacherge pernlt J <br />have been applied for with the npproprinte egenciea. <br />It is anticipated that between one end two ecrea per year <br />will be ectlvily mined to provide the expected <br />requirements of the operation. These areea of major ~4N¢ <br />diaturbence will be mined ns de ep ea practicable. The ry °~' 3H.IJ~ <br />resulting completed excevetiona will be eloped on d <br />, 7 S <br />epproximetely a 2:1 elope to n level approximately flue P~¢~ ,~l,f°i <br />' <br />feet below normal gr ound water line. From that point to p'n`~ <br />ground level will be eloped on epprox imetely a 3:1 elope. <br />Approximately 2 to 4 <br />used et any one time <br />that enough materiel <br />at leant 30 yearn. <br />acres within the pit eree will be <br />for etockpilea. It la anticipated <br />exiata within the pit eree to lest <br />It is anticipated that Wining will progress leaving a <br />serlea of ponds aepereted by dikes wide enough to <br />eccomidete vehicular traffic. Water will be purchased to <br />augment the loss to the basin ea a result of evaporation <br />from these ponds. It is now eatimeted that between <br />30,000 end 70,000 cubic yards of materiel will be <br />required each year from this pit to produce concrete <br />aggregates. <br />Actual mining operations eill probably only be conducted <br />for two months out of the yenr. Thla activity will <br />probably be conducted when the River is at low stage. <br />Processing of the excavated meterlela will take <br />approximately two months. Proceaaingmny or may not be <br />done during the excavation period depending on the <br />eveilebility of equipment end the weather conditions. <br />