Laserfiche WebLink
i ~~ CUS7 ES T1nATIr+G PROCEDURES <br />1. Monilization and Demootlixation <br />(]Ot of hems 1 through 5) <br />2. Structural Deolition <br />(Actual Coats) <br />3. Beckfilling and Grading <br />(Acruel Cubic Yerd Costal <br />~ 4. Replacing Topsoil <br />(AC[ual Cubic Yerd Costa) <br />5, Seeding, Per[ilizetlon, Mulching <br />IACtual Acreage Coate) <br />6. Contingencies <br />l10\ of Items 1 through 5) <br />7, Hard Coate <br />(Sub[otal of Items 1 through 6) <br />8. Engineering Coat^ <br />i1 of Line 7, see Graph II-2) 5.5% <br />~9. Reclamntion Mnnagement and Administration <br />(t of line 7, see Graph II-3) 3% <br />10, Profit and Overhand <br />1~ of line 7, sec Gcnph II-l) 13.7% <br />TOTAL COST ESTIMATE POR BONDING PURPOSPS <br />~a <br />~ 287,518 <br /># 249,500 <br />2 , 524 , 609 <br /># Inc. Above <br />$ 213.200 <br />327,483 <br />3,602,310 <br />198,127 <br />$ 108,069 <br />493,516 <br /># 4,402,022 <br />-121- <br />