Laserfiche WebLink
SllHHaRY SHCET <br />. ~ oo, iilerion and Dcmoeiltzetlon # 287,618 <br /> 10t of line items 2 through S <br />2. Demolition $ 249 500 <br /> Buildings and Pecilltles 147,500 <br /> Railroad Spura end Loops ~ <br /> Portals end ShaCt• <br /> Thick Slobs <br /> Conveyors S 11.500 <br /> Road c perking Surtncing ~ $2,500 <br /> Culverts and Bridges { <br /> !once Lines S 2,000 <br /> Power Lines ~ 6,000 <br /> <br />3. 8eckf1111nq and Gredinq # 2, 524,609 <br /> Backfilling Pit^ A g B Pits $2,524,609 <br /> Highvnll Reduction $ <br /> <br />Spoil Ridge Reduction # <br /> Pinal Grading { <br /> Roods i Rnilronda <br /> Closing Portals and Shafts $ <br /> <br />~. Replacing Topsoil # ~Tn!' in ahn,ro~ <br /> <br />S Revegetecion <br />656 @ $325 # 213,200 <br /> /A <br /> Seedbed Prepnratlon <br />'~. Pertilizing <br /> Seeding <br /> P1nnting, Trees c bhrub^ { <br /> tiulching ~_ <br />6. Contingencies # 327,483 <br /> 10 L of Itcma 1 through S ~. . <br />7. Herd Costs ~ 3,602,310 <br /> Summation of Items 1 through 6 <br />e, engineering Cos[• # 798,127 <br /> Percentage of Item 7, from Graph 11-2 ( 5 5) <br />9. Reclamation Nenegement and ~dminlatta[ion # 1(1 _f1Fiq <br /> Percentage of Item 7, Prom Graph 11-3 13.0> <br />10, Profit and Overhead $ 493,515 <br /> Percentage of Item 7, from Graph 11-1 Q3.7) <br />11. Total Cost estimate for Bonding Purposes # 4,402,022 <br /> Summation of Items 7, 8, 9, and 10 <br /> Engineering Neva Record Cost Index Data <br />'~~ <br />-120- <br />