Laserfiche WebLink
IX. VEHICLE HAUL ROADS - N/A <br />CONTROL OPTIONS FOR VEHICLE HAUL ROADS <br />(DO NOT WRITE IN THIS SECTION) <br />1. Watering (specify) _ times/day, to maintain moist surface. <br />2. Chemical stabilization (according to manufacturer s specifications). <br />Specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAUL ROAD CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> <br />U <br />A. TRANSPORT OF RAW MATERIAL FROM REMOVAL SITE TO STOCKPILE <br />Distance (one way): - 4.5 miles . (If stockpile is off site, give distance from removal site to mine entrance. ) <br />Haul velvcle capacity: 70 tons . No. of wheels: 34 . <br />Average vehicle speed: 15 m.p.h. <br />Maximum vehicle speed: 30 m.p.h. (cannot exceed 30 m.p.h.}. <br />No. oftiips per day: 128 . <br />Haul road silt content (if known): <br />ova <br />List com[rols for raw materials transport: (see measures listed above). <br />Proposed controls: Water and gravel. <br />C~ <br />8 <br />