Laserfiche WebLink
B. FINISHED PRODUCT TRANSPORT (ON SITE1- N/A <br />• 1. Haul Trucks <br /> <br />CAPACITY EMPTY <br />WEIGHT NO. OF <br />TRUCKS NO. OF <br />WHEELS NO. OF TRIPS <br />PER/DAY AVG. SPEED <br />ON SITE <br />1. Yds. M h <br />2. Yds. M h <br />3. Yds. M h <br />4. Yds. Mph <br />2. Haul Road Information For Final Transaort <br />On site haul roads distance (one way): Haul road silt content (if known): %. <br />List controls for final transport: (see measures listed above). <br />Proposed controls: <br />• C. OTHER ROADS ON-SITE <br />WHAT IS ROAD <br />USED FOR? LENGTH OF <br />ROAD? (DISTANCE) <br />FROM TO <br />CONTROLS SEE PAGE 7 <br />1. Mine access Variable Gravel or no control <br />2. Environmental <br />monitorin Variable Gravel or no control <br />3. <br /> <br />