My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116409
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116409
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:16 PM
Creation date
11/25/2007 2:14:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
5/5/2005
Section_Exhibit Name
Tab 13 Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Restoration. Unless SCC requests retention of haul roads for postmining land use and the Division <br />• approves such request, immediately after the road is no longer needed for operations, reclamation, or <br />monitoring: <br />a. The road will be closed to vehicular traffic; <br />b. The natural-drainage patterns will be restored; <br />c. All culverts will be removed; <br />d. Roadbeds will be ripped, plowed and scarified; <br />e. Fill slopes will be rounded or reduced and shaped to conform the site to adjacent terrain and to <br />meet natural-drainage restoration standards; <br />f. Cut slopes will be shaped to blend with the natural contours; <br />g. Terraces will be constructed as necessary to prevent excessive erosion and to provide long- <br />term stability in cut-and-fill slopes; <br />h. The regraded area will be reclaimed in accordance with the approved reclamation plan; <br />i. Unless otherwise authorized by the Division, all road-surfacing materials will be removed, <br />hauled or conveyed and disposed under 4.11.4. <br />Access Road. There are approximately 3.0 miles of existing and proposed access roads within the <br />mine area. These roads are shown on Exhibits 20-2 and 20-2A, Postmining Topography and include: <br />• Interim Oil Well Access Road -begins near the north end of Haul Road A and extends 1,558 <br />feet to an active oil well. 10.3 mi.l (Reclaimed falllwinter 2003) <br />• Postmine Oil Well Access Road - a permanent access road that would begin near the north <br />end of Haul Road A and extends 1,743 feet to an active oil well. f0.3 mi.j <br />• Ridgeline Access Road - a proposed permanent access road that connects Haul Road G with <br />Haul Road H. (2.4 mi.) <br />• Coal Carrier Access Road - a permanent access road to service coal carriers shop 10.1 mil. <br />As required by Section 4.03.21f)lii), SCC is providing the following "relevant showing" statement in lieu <br />of certification for the design and construction of the Coal Carrier Access Road. This road was <br />constructed prior to August 1, 1995 and is located near the eastern end of the Tie-Across Haul Road. <br />As required by Section 4.03.211) this access road was constructed during the same time frame and <br />presumably to the same standards and construction methods as were previously approved for the Tie- <br />Across Haul Road. Over the past 12+ years this access road has had the same type of care and <br />maintenance that is conducted on the Tie-Across Haul Road. The existing road is of adequate width for <br />the intended use, the road has an adequate gravel surface, the ditches are open and functioning as <br />intended, and the road surface is maintained by motor grader and watered on an as-needed basis. As <br />such SCC believes that the requirements of Rule 4.03.2121, 13), 14), 151, and (6) have also been met to <br />the extent that compliance with requirements can be observed and evaluated. <br />Exhibit 13-11.7a, Coal Carrier Access Road, presents a plan view and cross-section of the road as it <br />exists. <br />TR-45 26 Revised 3/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.