Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />- MINING OPERATIONS - <br />• <br />K. FINISHED PRODUCT STOCKPILES <br />Maximum Stored At One Time: N/A Tons <br />Proposed Controls For Finished Product Stockpile: <br />^ Watering Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />Page 5 of 6 <br />^ Enclosures Type: (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />^ Other (specify) <br />C~ <br />1 <br />2 <br />3 <br />4 <br />L. RAW MATERIAL TRANSPORT FROM REMOVAL SITE TO STOCKPILE(S) <br />Haul road distance (one way) N/A Feet <br />Road surface silt content (if known) N/A <br />Posted speed limit on haul road N/A m.p.h. <br />^ Watering <br />^ Frequent (Watering Frequency of 2 or More Times Per Day) <br />^ As Needed <br />^ Chemical Stabilizer <br />^ Gravelling <br />Vehicle Tvoe <br />18-Wheelers <br />10-Wheelers <br />4-Wheelers <br />Ca aci Emoty Weight <br />Tons Tons <br />Tons Tons <br />Tons Tons <br />Tons Tons <br />M. FINISHED PRODUCT TRANSPORT (ON SITE) <br />Ca aci Emptv Weight <br />Tons Tons <br />Tons Tons <br />Tons Tons <br />70 Tons 25 Tons <br />Amount of material for off-site transfer: 1,100,000 Tons per year <br />On-site haul road distance (one way) 23,760 Feet <br />Road surface silt content (if known) <br />Posted speed limit on-site: 40 m.p.h. <br />® Watering <br />^ Frequent (Watering Frequency of 2 or More Times Per Day) <br />® As Needed <br />® Chemical Stabilizer <br />~ Gravelling <br />• 1 <br />2 <br />3 <br />4 <br />Vehicle Twe <br />] 8-Wheelers <br />10-Wheelers <br />4-Wheelers <br />34-Wheelers <br />Revised October 2002 <br />No. Of Trips Per/Dav <br />No. Of Trios Per/Dav <br />128 <br />http://www.cdphe.state.co.us/ap/stationar ~Laso <br />