Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 4 of 6 <br />- MINING OPERATIONS - <br />• I. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? No <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLLCATION AND <br />APEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed per year: N/A <br />Maximum tons crushed per hour: N/A <br />Hours of crushing per day: N/A <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />Tons <br />Tons <br />SCREENING/CLASSIFYING <br />Maximum tons screened per year: N/A <br />Maximum tons screened per hour: N/A <br />Hours of screening per day: N/A <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />Tons <br />Tons <br />SECONDARY CRUSHING <br />Maximum tons crushed per year: N/A <br />Maximum tons crushed per hour: N/A <br />Hours of crushing per day: N/A <br />• Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />RESCREENING/CLASSIFYING <br />Tons Maximum tons screened per year: N/A Tons <br />Tons Maximum tons screened per hour: N/A Tons <br />Hours of screening per day: N/A <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />J. CONVEYORS/TRANSFER POINTS <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />^ Enclosure Type: <br />^ Other (specify) <br />Number Of Transfer Points : N/A <br />Proposed Controls <br />^ Enclosure Type: <br />^ Water Spray <br />^ Chemical Stabilizer <br />^ Other (specify) <br />N/A Tons. <br />N/A Tons. <br />(Complete or Partial) <br />(Complete or Partial) <br />• (Indicate On A Separate Diagram How Conveyor Sys[em Is Set Up) <br />Revised Oc[ober 2002 http:/iwww.cdphestate.co.us/ap/stationary asp <br />